Coastal electrics, done properly, first time.5% off for pensioners 07763 100 477 · hello@margateelectrical.co.uk
Margate & ElectricalOld Town · Cliftonville · Westbrook · CT9

Guides · 2026-11-16

What your electrics need before a heat pump goes in.

An air source heat pump needs its own dedicated circuit from the consumer unit, protected by an RCD, with a cable and breaker sized to the manufacturer's data sheet. Most Margate homes can take one, but the consumer unit, the incoming supply and the earthing all need checking first, and the heating engineer and the electrician each have a separate part to play.

Start with the data sheet, not the brochure

Every heat pump model publishes its maximum running current, the breaker size it needs and the cable it expects. Smaller domestic units commonly sit somewhere between 16A and 32A, larger ones need more, and some models need a separate supply for a backup or immersion heater. Your electrician works from that document, not from a rule of thumb, so ask the installer for the exact model number before anyone quotes for the electrical side.

The five electrical checks

CheckWhy it matters
Consumer unitNeeds a spare way for the new circuit, RCD protection and a sound enclosure. Old rewireable fuse boards usually need replacing first. See consumer unit upgrades.
Supply capacityA heat pump adds a large, steady load. Your electrician assesses total demand and, if it looks high, the network operator may need to be told.
Earthing and bondingMust be verified, because a new outdoor unit with metal casing connects into your installation.
Cable routeFrom the consumer unit to the outdoor unit, often armoured cable run through walls, buried or clipped externally.
IsolatorA weatherproof switch near the outdoor unit so it can be shut off safely for servicing.

Who does what

The heat pump itself, the refrigerant side and the hot water cylinder are the heating installer's job. The new circuit, the isolator, the consumer unit work and the testing belong to a registered electrician. A new circuit is notifiable work under Part P of the Building Regulations in England, so it must be certified and notified, and you should receive an Electrical Installation Certificate afterwards.

Not a DIY job

Work inside the consumer unit and any new circuit is for a registered electrician only. Do not attempt to connect a heat pump yourself, and do not run it from a plug and extension lead.

Grants and certification

Government grant schemes for heat pumps in England have conditions, usually including installation by a certified installer. Terms and amounts change, so check the current rules with your heating installer before you commit, and keep the electrical certificate with the rest of the paperwork.

What else gets looked at

Margate: coast, conservation areas and older houses

The outdoor unit of a heat pump sits in the open air, and within about 400m of the seafront salt aerosol attacks cheap enclosures, glands and fixings. Specify weatherproof isolators and marine-grade fittings on seafront streets and clifftop roads, as set out in our salt-air spec guide. Much of Old Town and Cliftonville sits in the Margate Conservation Area and there are listed frontages in places, so external equipment can raise planning questions; check with Thanet District Council before you order, especially for anything visible from the street. Older Victorian houses often have original wiring and a tired fuse board, which is why the consumer unit check comes first.

Questions we hear

Most people want to know whether the existing supply will cope and whether the house needs rewiring. The honest answer is that it depends on the inspection, and an EICR is the quickest way to know where you stand before spending on the heat pump itself.

Questions to ask before you sign anything

  1. Which exact model is being fitted, and what breaker size and cable does its data sheet specify?
  2. Has anyone looked at the consumer unit, the earthing and the incoming supply, or is the electrical side an afterthought?
  3. Who is responsible for the new circuit, its certificate and notifying the work?
  4. Where will the outdoor unit and its isolator go, and has the noise and position been considered?
  5. Does the quote include making good where cables cross walls and floors?

A heat pump runs for long periods at a steady load, so a marginal connection or an undersized cable that would be tolerable on a kettle can overheat. That is why we insist on testing the whole circuit, including the termination at the consumer unit, before commissioning. If your electrician offers to run the unit from an existing socket circuit to save money, say no. It is also worth knowing that insulation, radiator sizing and controls all affect how hard the heat pump has to work, so the electrical load you see on paper depends on the rest of the heating design.

Common questions

Does a heat pump need its own circuit?

Yes. A heat pump is a large, continuous load, so it is normally wired on a dedicated circuit with its own correctly sized breaker and RCD protection, following the manufacturer's data sheet.

Will I need a new consumer unit for a heat pump?

Often, particularly if the existing one is an old fuse board, has no spare way or lacks RCD protection. Your electrician will check this at survey stage.

Is heat pump wiring notifiable in England?

A new circuit is notifiable under Part P, so it should be installed by a registered electrician who certifies and notifies the work and gives you an Electrical Installation Certificate.

Need this done on your property?

Photos, postcode and a short description to hello@margateelectrical.co.uk or WhatsApp 07763 100 477. Same-day fixed quote.