Service · EV Charger
OZEV-eligible 7kW single-phase EV chargepoint installs across Margate, Cliftonville and Palm Bay. DNO G98 notification handled. Conservation-area siting for Old Town frontages. From GBP 850.
The general OZEV Electric Vehicle Homecharge Scheme closed to homeowners in April 2022 and the current grant runs only for:
Homeowners with driveways don't currently qualify. I'll tell you at survey stage which category you're in - no point applying if it'll be rejected.
Old Town Margate frontages (Hawley Square, King Street, Fort Crescent, Cold Harbour) are inside the Margate Conservation Area and often Grade II listed. A wall-mounted charger on the front elevation of a listed building needs listed building consent from TDC, which takes 6-8 weeks. Two workarounds I use routinely:
Cliftonville is mostly in the CA but has fewer listed frontages - most CA-only jobs can proceed without individual consent as long as you're not attaching to a listed elevation. I check TDC's Historic England list before quoting.
UK Power Networks require notification (G98 or G99) for any EV chargepoint above 16A on a single phase. In Margate the standard 60/80A single-phase supply generally has headroom for 7kW without needing an upgrade - I run a max-demand calculation as part of the survey. If your property has an old 60A supply and you're planning charger + heat pump + induction hob, we may need to talk to UKPN about a service upgrade (free but takes 4-6 weeks).
All modern OZEV-eligible chargers include dynamic load balancing - the charger reduces its draw automatically if you're running the shower and cooker at the same time, so you don't trip the main. Zappi and Ohme also integrate with solar (see solar service) to charge from surplus PV when it's available, which is worth having if you're planning solar in the next 2 years.
The install cost depends heavily on the cable run from the CU to the driveway. Under 10m in a straightforward route: GBP 850 all-in. 10-25m or requiring floor lifting/exterior chasing: GBP 950-1,150. Over 25m or crossing outbuildings: quoted individually. I do this survey by photo first (send me a photo of your CU and one of where you want the charger), then confirm on site.
I won't install a 7kW charger on a CU that's already at capacity - if you need CU upgrade + charger, that's one combined quote and one visit. And I won't cable-tie a charger to a listed brick facade to avoid the consent conversation - it damages the property and TDC find them eventually.
Always on every job
10-year workmanship guarantee 5% off for pensionersPhotos and postcode to hello@margateelectrical.co.uk or call 07763 100 477. Same-day quote in working hours. OZEV-eligible install from GBP 850. Non-grant install GBP 1,100.