Extending your house: how to plan the circuits so you only open the walls once.
An extension is the best time to fix your electrics, because walls and floors are open and cable is cheap compared with chasing finished rooms later. The aim is a design that lists every light, socket and appliance before first fix and checks that the consumer unit and supply can carry the extra load.
Start with the design, not the cable
Before anyone runs cable, produce a room-by-room list of what you want to power, then ask the electrician to turn it into a circuit plan. Changes after plastering are far more expensive than changes on paper.
The planning list
- Sockets at worktop, island and appliance positions, and at furniture positions in living areas.
- Lighting: general, task and feature, with switches in logical places and dimming where wanted.
- Appliances: oven, hob, dishwasher, washing machine, fridge-freezer and any heating.
- Underfloor heating, which has its own supply and thermostat.
- Outside: patio lights, sockets and any garden supply. See outdoor sockets and garden power.
- Data, TV and aerial points, and any smart home wiring.
- Smoke and heat alarms, tied into the rest of the house.
How circuits are usually split
| Load | Typical approach |
|---|---|
| General sockets | New ring or radial, or an extension of an existing one if it has capacity |
| Cooker or hob and oven | Dedicated circuit sized to the appliance |
| Dishwasher, washing machine | Often on their own circuits or protected separately to avoid shared trips |
| Lighting | Separate lighting circuit, sometimes one per floor |
| Underfloor heating | Dedicated circuit with the correct protection |
| Outside supplies | Their own circuit or a protected spur, as designed |
The consumer unit and supply
Extensions add load, and the existing consumer unit may not have room for the new circuits or the right protection. Modern consumer units use RCBOs for finer protection, and if yours is old it is usually cheaper to upgrade it as part of the extension than later. See consumer unit upgrades. For large added loads, such as an EV charger, a heat pump or batteries, the supply capacity should be checked early.
First fix and second fix
- First fix: cables run through joists and walls, boxes installed, before plastering or plasterboard.
- Plastering and decoration: everything is closed up.
- Second fix: accessories, light fittings and the consumer unit connected and tested.
- Testing and certification: final tests, certificate and Building Regulations sign-off.
Sequence matters
Give the electrician access before plasterboard, not after. A missed first fix means chasing new walls or running surface trunking, neither of which is what you planned.
Regulations
New circuits are notifiable under Part P. Extensions are usually under building control, and your electrician either notifies the work or you pay building control to inspect it. You should receive an Electrical Installation Certificate, and keep it with your other completion paperwork.
Margate extensions: what is typical
Many extensions in the area are made to older terraced and semi-detached houses, where the existing wiring may be decades old; an inspection before the build tells you whether to extend the existing installation or replace it, and in some cases a rewire at the same time saves a second disruption. In the conservation area and around listed buildings, planning rules affect how an extension looks, so confirm consent before ordering anything. Seaside weather also makes external fittings work harder, so specify weatherproof, corrosion-resistant fittings on outside walls; see our salt-air guide. If your extension includes a kitchen, think through the island and appliance positions before first fix. Send us the plans and we will comment on the electrical side.
Questions to ask your builder and electrician
- Who is responsible for the electrical design: the builder, the electrician or an architect?
- When will the first fix happen relative to plastering, floor screed and insulation?
- Will the existing installation be tested before it is connected to the new one?
- How will the new circuits be protected, and does the consumer unit have space?
- Who certifies the work, and how will it be notified to building control?
Easy wins while walls are open
- Add spare conduits or draw cords for future cables.
- Run a network cable to each main room.
- Position sockets for the furniture you actually own, not a generic plan.
- Put switches where you will reach them as you enter, with two-way switching for long rooms.
- Consider an outside socket and light on the new wall.
Avoid common delays
Electrical work often sits between the builder, plasterer and kitchen fitter. Agree dates early, tell the electrician when kitchen layouts are final and keep a copy of every change. Late changes to appliances or sockets can mean extra visits. Keep a list of everything agreed and check it against the finished work before the final payment.
Budget sensibly
Electrical costs in an extension are driven by the number of circuits, the length of cable runs, the consumer unit and how much lighting and data you want. Ask for a written, itemised quote and a clear allowance for items you have not chosen yet, such as light fittings. Cheaper is not better if it leaves out testing, certification or the consumer unit work, because those items return as extras later.
Common questions
When should an electrician get involved in an extension?
As early as the design stage, so circuits, sockets and lighting are planned before first fix. Changes after plastering are costly.
Will my consumer unit cope with an extension?
Possibly not. Check for spare ways, RCD protection and condition. Many people upgrade it as part of the project.
Is extension wiring covered by Building Regulations?
Yes. New circuits are notifiable under Part P in England, and you should receive an Electrical Installation Certificate.